The asphalt parking lot to the south of Wipfler Park, off the Tibbott Elementary School Parking Lot, is up for replacement as part of the district’s capital asset replacement plan. Due to the evolving needs of the Bolingbrook Park District and safety concerns, we have decided to remove the parking lot and access road and replace with field turf.
This 12-foot-wide access road has been improperly used as a two-way street for vehicles between Laurie Circle and Queenswood Road. This has posed significant risks to pedestrians, spectators and drivers. It has also caused damage to the access road and adjoining landscape. This access road was constructed in 2001 to accommodate growing baseball leagues. There is no longer a need for this parking lot and access road since league play has discontinued at this site.
The decision to remove this access road was not made lightly. We have conducted thorough assessments and engaged in extensive discussions with the park district, village and school officials to ensure this change does not impact school children drop-off or public safety with emergency vehicles.
Parking will still be available at Tibbott School (off Queenswood/Gary Drive) for those wishing to utilize the fields on the south end of Wipfler. Removal of the parking lot and access road will begin on June 23rd and be completed prior to the start of the 2024/2025 school year.
Numerous projects are planned for 2024 to enhance and maintain Bolingbrook Park District assets. Below is detail of each capital project for the year.
Bloomfield Oasis Park Playground Replacement
This is a replacement of 19-year-old playground equipment. Equipment is scheduled to be replaced with Burke equipment. The overall project includes replacement of the playground and ADA items. Project is anticipated to start in April with completion in summer. COMPLETE
Champions Park Playground Replacement
This is a replacement of 19-year-old playground equipment. Equipment is scheduled to be replaced with Burke equipment. The overall project includes replacement of the playground and ADA items. Project is anticipated to start in April with completion in summer. This project is partially funded through an Illinois Department of Commerce & Economic Opportunity grant. COMPLETE
Lilac Park Playground Replacement
This is a replacement of 18-year-old playground equipment. Equipment is scheduled to be replaced with Burke equipment. The overall project includes replacement of the playground and ADA items. Project is anticipated to start in April with completion in summer. This project is partially funded through an Illinois Department of Commerce & Economic Opportunity grant. COMPLETE
Sealcoating 2024
This project includes sealcoating District property throughout Bolingbrook. This is an annual project the District performs to maintain 18 miles of asphalt trails and over 1 million square feet of parking lot throughout community. Work is scheduled to take place starting spring and continue through early fall.
Annerino Community Center Partial Roof Replacement
Project includes partial replacement of EPDM roofing at the Annerino Community Center. The existing roof is 24 years old. This project is partially funded through an Illinois Department of Commerce & Economic Opportunity grant. COMPLETE
Central Park Splash Pad
This project is partially funded through Will County and the American Rescue Plan Act. The project includes excavation and installation of a new splash pad with multiple amenities. It will also picnic tables, benches and shade structure for patrons. Construction will begin in late 2024 with anticipated opening of Splash Pad in May 2025.
Ashbury’s at Boughton Ridge HVAC Replacement
The project is partially funded through Will County and the American Rescue Plan Act. Replacement of original 2008 HVAC units at Ashbury’s at Boughton Ridge. Work is scheduled in early spring 2024. COMPLETE
Outdoor Pelican Harbor Zero-Depth Pool Sandblast/Painting
The project consists of a complete sandblast of the entire outdoor Pelican Harbor zero-depth pool, removal of existing expansion joints, installation of new expansion joints, preparation of any concrete cracks and complete repainting of the pool. The project will take place in advance of the pool opening in May 2024. COMPLETE
Outdoor Pelican Harbor Hot Water Tank Replacement
Removal and replacement of hot water tank in the Pelican Harbor Outdoor Aquatic Park that services the bathhouse. Work is scheduled to be complete prior to the outdoor opening in May 2024. COMPLETE
Pelican Harbor Pool Improvements
The Park District will be replacing chlorine hoppers that feed chlorine to the pools, pool main covers, pool pumps and pool drain grates. Work will continue throughout the entire year.
Bolingbrook Park District Truck Replacements
The Park District will be replacing three trucks pending availability. Two Ford F-150 and one F-450 are expected as replacement.
Bolingbrook Park District Weed Fertilizer Machine Purchase
The Park District will be purchasing a new Weed & Fertilizer machine to assist in performing fertilizer applications in-house vs. outside contracting. COMPLETE
Outdoor LED Ballard Light Replacement at Annerino Community Center
The Park District will be replacing outdoor LED lights at the Annerino Community Center, which were installed in 1999 during renovation. COMPLETE